HomePlatform › Contractor Management

Platform module Roadmap module

Contractor Management

Prequalification with computed scores, document expiries that raise actions, and a qualification history nobody can quietly edit.

Prequalification

Nobody edits a percentage by hand.

Every prequalification is a scored checklist. Section scores compute from the responses, the overall computes from the sections, and the outcome follows the thresholds — approve, revision required, or reject. A contractor below a section floor cannot be approved, however good the total looks.

Thresholds you configure

Approval bands and section floors are tenant-configurable — your procurement rules, enforced by the workflow rather than remembered by a person.

Revision is a loop, not a rejection

Below the band, the contractor resubmits evidence against the named sections; the score recomputes on assessment, and every revision carries a written reason.

Documents raise actions

Insurance, registrations and certificates carry expiry dates; approaching expiry creates an owned action in the same register as every other action.

Scroll the image sideways to read it →

A contractor prequalification record: revision-required status, the approval thresholds, and a scorecard showing an overall 74 per cent with six weighted sections — management system, competency, equipment control, emergency arrangements, legal and insurance, and performance history — two of them below the seventy per cent section floor. Alongside it, key documents with their expiry dates and the actions they raised, an append-only qualification history including the assessor's written reason for the revision, and the linked action and audit records.

One prequalification, opened: section scores, the floor that holds the outcome, and the append-only history behind every revision.

BSLR product interface · illustrative data, fictional tenant “Northgate Construction & Energy” · Roadmap module

Every contractor, every site, one status.

Approved, revision required, suspended — with the PQ score, key documents and deployments visible in one row. A suspension applied after an audit finding is visible to every site the contractor works on, the moment it happens.

Scroll the image sideways to read it →

The BSLR contractor register: KPI tiles for approved, revision required, suspended, requalification due within sixty days and documents expiring within thirty days; below, a table of contractors showing name and commercial registration, trade, prequalification score, key documents with expiry warnings, number of sites deployed, requalification date and status.

The register — score, documents and deployments in one row, with a suspension visible everywhere the contractor works.

BSLR product interface · illustrative data, fictional tenant “Northgate Construction & Energy” · Roadmap module

Contractor control built around ISO 45001 §8.1.4 — procurement, contractors and outsourcing.

Bring us the contractor file you’d least like audited.

Thirty minutes, one real contractor, scored live against your own thresholds.